Vancouver, BC

First phase of upgrades included the complete replacement of the 30-year old, 25-metre 6-lane pool tank, along with associated code and structural seismic upgrading. Thoughtful planning and budget control created the opportunity for a 1,000 ft² glazed addition and large leisure-style hot pool which is cantilevered over the ravine. Following a successful 2008 feasibility study, the addition of new men’s, women’s and universal change rooms, as well as a revitalized entry and lobby, was completed in 2010.