Renfrew Park Community Centre Upgrades
Vancouver, BC
Sometimes what starts as necessary and technical code and seismic upgrades results in much, much more. A five year process saw this community favourite lovingly upgraded to not only meet modern safety standards but to feature a large hot pool cantilevered over the spectacular Renfrew Ravine, a bright new lobby, and Canada’s first ever use of glass lockers.
Kensington & Robert Burnaby Park Washrooms
Burnaby, BC
Vanguards of a quiet renaissance in BC public washrooms, Robert Burnaby and Kensington Park Washroom Buildings redefine the standards of park amenity buildings. Playful, durable as all get out, and each crafted to respond to their peculiar sites, these modest buildings are the grandparents for 20 years of park infrastructure.
Cloverdale Youth Skate Park
Surrey, BC
Some projects remain dreams. The Cloverdale skatepark drew inspiration from the nearby BCHydro ROW – a crumpled structure of industrial steel, wrapped in translucent cladding.
Penticton Community Centre
Penticton, BC
In a complete reversal of the existing facility, this addition project is characterized by an introduction of daylight and bright colours to create a welcoming, fun aquatic centre for Penticton residents. The existing modest lap pool and teaching pool was upgraded into a new competition 10 lane lap pool, and generous leisure and hot pools – and a waterslide! (With MAD Studio.)
Photography: Yuri Akuney
Ambleside Fieldhouse
West Vancouver, BC
The existing fieldhouse at Rutledge Park still had some life left; it just needed new accessible washrooms, accessible changerooms, offices, ventilation and heating systems; all without affecting the existing shell structure and envelope. Ultimately, we reworked the existing interiors to be generous and logical; and added two small pods to the entrances of the changerooms to house all new mechanical systems without burdening the existing building structure.
Kelowna Family YMCA Renovations
Kelowna, BC
This is one of our best examples of participating in iterative improvemetns over time. The work here started with lobby and facade renovations in 2000 and ultimately culminated in refreshed change rooms; including the ever popular and equiatble, universal change village over a decade later.